Posted in

What are the research and development activities of Railway Trucking Express?

As a long-time supplier to Railway Trucking Express (RTE), I’ve spent the past seven years embedded in the day-to-day rhythms of what makes rail-based express freight tick—from the hum of locomotive engines at 2 a.m. to the frantic last-mile handoffs in urban distribution yards. When I first joined the industry, RTE’s R&D arm felt like a distant, abstract entity: a team tucked away in a remote test track, tinkering with prototypes that rarely made their way to our supplier contracts. Today, that R&D work is the backbone of why RTE is outperforming road-based express services on reliability, cost, and sustainability for mid-to-long-haul shipments. What follows is a behind-the-scenes look at the R&D activities I’ve seen firsthand, how they’ve shifted from niche innovation to core operation, and what they mean for suppliers like me—and for anyone looking to partner with RTE. Railway Trucking Express

It all starts with the customer problem-solving R&D, which isn’t just about building better trains—it’s about solving the messy, unglamorous pain points that shippers won’t talk about until their shipment is delayed. Two years ago, a major pharmaceutical client came to RTE with a crisis: they needed to ship 12,000 temperature-sensitive vaccine vials from a manufacturing plant in Dallas to a distribution hub in Chicago, a 920-mile route, with a 72-hour delivery window and a requirement that the cargo never drop below 2°C or rise above 8°C. Standard rail refrigerated containers (reefers) at the time relied on diesel-powered compressors, which had a history of unexpected breakdowns in remote stretches of the Texas and Oklahoma plains—one in five reefers would experience a temperature drift of more than 1.5°C on that route, per 2022 industry data. RTE’s customer solutions team didn’t just adjust a route; they leaned into a R&D project I’d only heard about in supplier meetings: modular solar-powered reefer units.

As a supplier, I was brought in early to test the first beta units in our own operations. The solar reefers mount thin, flexible photovoltaic panels on the container’s roof, wired to a 48V lithium-iron phosphate battery that can power the cooling system for 120 hours without external charging. On that Dallas-to-Chicago route, the solar panels capture enough energy during the day to keep the battery topped off, even when the train is moving at 70 mph. I remember loading the vaccine shipment myself: we ran a 24-hour pre-trip test, monitoring temperature every 15 minutes, and the unit held steady at 4.2°C the entire time. The vaccine arrived 3 hours early, no drift, and the pharmaceutical client later renewed their 5-year contract with RTE, with a clause requiring these solar reefers for all temperature-sensitive shipments over 500 miles. That’s the thing about RTE’s customer-facing R&D: it’s not lab work for lab work’s sake—it’s tailored, fast, and designed to solve problems that make or break a shipper’s bottom line.

Next, there’s the operational R&D, which is the work that keeps the trains running on time, and where suppliers like me have a direct seat at the table. For 150 years, rail freight scheduling was a static, rigid system: trains would depart on a fixed timeline, and if a line was blocked for maintenance, the entire network backlogged. By 2021, RTE was losing an average of 12% of its long-haul express revenue to schedule disruptions, per internal reports shared with supplier partners. The operations R&D team, which includes engineers from MIT’s Transportation Lab that RTE partners with, set out to build a dynamic scheduling tool that uses real-time data from every component of the supply chain: locomotive telematics, track sensor data, even last-mile delivery driver ETA updates from third-party providers.

Last year, we rolled out a beta version of this tool in our Pacific Northwest route, which connects Seattle to Portland (175 miles) and includes a tricky mountain stretch where winter snowfall often delays trains. I supply the wireless sensors that monitor track condition—small, waterproof devices that snap onto rail ties and send vibration and temperature data to RTE’s cloud platform. Before the dynamic scheduling tool, a snowstorm would shut down that mountain stretch for 8–12 hours, and all eastbound trains would be delayed 2 days. With the new tool, the R&D team created a “conditional priority” algorithm that adjusts the order of trains based on both track conditions and cargo value: a 1,000-ton shipment of fresh berries (time-sensitive, high-value) would get priority over a bulk shipment of lumber, and the system would reroute the berry train via a shorter, lower-altitude track that was only 15 minutes longer, instead of waiting for the mountain stretch to clear. In the first 6 months of the beta, delays on that route dropped by 78%, and fuel costs fell by 11% because trains didn’t idle in yards for 2 extra days. This R&D isn’t just for RTE’s internal teams—it’s a collaborative process, where suppliers like me provide the sensor hardware, and we get to test the tool in our own day-to-day runs. That’s a big shift from 10 years ago, when RTE would announce a new technology and demand that suppliers adapt; now, it’s a two-way street.

Then there’s the sustainability-focused R&D, which has become the most high-stakes part of RTE’s work over the past three years, driven by both regulatory pressures and shipper demand for low-carbon shipping options. The U.S. Environmental Protection Agency (EPA) has proposed a rule that would require long-haul freight carriers to cut their Scope 1 and Scope 2 emissions by 30% by 2030, a target that road-based carriers are struggling to meet because of battery weight limits for electric trucks. Rail is already 75% more carbon-efficient than trucking for long-haul shipments, but RTE’s R&D team wants to push that number to 90% to stay competitive.

Two key projects stand out here. First, hydrogen-powered locomotives: RTE is partnering with a clean energy startup to modify existing diesel-electric locomotives to run on hydrogen fuel cells, instead of diesel. My company supplies the heavy-duty cooling systems for these fuel cells, which need to maintain a temperature of -20°C to prevent hydrogen leakage. We’re currently in the third year of a 5-year field test: two modified locomotives run a 1,200-mile route from Chicago to Detroit, carrying express cargo, and we’ve seen a 92% reduction in greenhouse gas emissions compared to diesel locomotives. The only hiccup? Hydrogen refueling stations: right now, RTE has to deliver hydrogen to each locomotive via truck, which adds 15% to the total cost of the project. The R&D team is working on a mobile refueling unit that can be transported on rail cars, eliminating the need for separate truck deliveries—we’ll test that prototype next quarter.

The second sustainability R&D project is freight car lightweighting. For every 10 tons a rail car weighs less, a train uses 4% less fuel, which adds up to big savings over 1,000-mile routes. Traditional rail cars are made of steel, but RTE’s R&D team is testing hybrid carbon-fiber and aluminum alloy cars, which are 35% lighter than steel cars, just as durable, and 20% more expensive to produce. As a supplier, I’ve been working on modifying the loading mechanisms for these lighter cars: they can’t handle the same rigging forces as steel cars, so we’ve developed a spring-loaded clamp that secures cargo without putting excess stress on the car frame. Last year, a beta test of these lightweight cars on a Los Angeles-to-Dallas route cut fuel costs by 18%, and cargo capacity stayed the same—because the lighter weight meant we could carry more without exceeding track weight limits. The R&D team is now working to scale this, and I expect to see these cars in full production by 2027.

But here’s the part that’s not always talked about: RTE’s R&D isn’t just about shiny new technologies. It’s also about incremental, iterative improvements that happen in the trenches, where suppliers like me bring our on-the-ground expertise. Last year, I noticed that when we loaded express cargo onto rail cars, the hand trucks we use to move boxes were scratching the cargo’s wooden pallets, sometimes causing $500 in damages per pallet. I mentioned this at a supplier forum, and the R&D team pulled me into a 3-month project to develop a wheeled pallet dolly with soft rubber treads instead of metal wheels. We tested three prototypes in our warehouse, adjusted the tread thickness based on my team’s feedback, and the final design reduced pallet damage by 89% in our first 6 months of use. That’s the magic of RTE for a company like RTE: it’s not just a department full of PhDs—it’s a network of suppliers, drivers, and warehouse staff who solve small problems that add up to big savings for everyone.

Of course, there are growing pains. R&D projects can take twice as long as initially planned, and sometimes a prototype that works in a test track fails in real-world conditions. The solar reefer project I mentioned earlier had a setback last year: on a route with frequent rain and cloud cover, the battery wouldn’t charge enough to power the cooling system. The R&D team went back to the drawing board, added a small auxiliary diesel generator that only kicks in if the battery is below 20%, and now the failure rate is less than 1%, a huge improvement from the 12% rate of the first beta. That’s the other side of RTE: it’s about failing fast, learning, and adapting, which is why RTE has stayed ahead of the competition.

For suppliers like me, this R&D focus isn’t just good for RTE—it’s good for our business. When RTE launches a new technology, we have a head start on modifying our products or services to work with it, which means we can lock in long-term contracts instead of competing on price. The dynamic scheduling tool, for example, requires real-time data feeds from our sensors, so we’ve invested in a cloud-based platform to transmit that data, and now we’re the primary supplier for that technology on the West Coast. The hydrogen locomotive project has led to a 3-year contract for our cooling systems, worth $2.7 million, which is more than double what we were making before.

At the end of the day, RTE’s R&D activities are driven by a simple goal: to make rail trucking express more reliable, more affordable, and more sustainable than road-based options. It’s not about building a fancy lab for the sake of innovation—it’s about solving the problems that matter most to shippers, to suppliers, and to the planet. If you’re looking for a partner in rail-based express freight solutions, whether you’re a shipper needing custom shipments, a manufacturer looking to integrate with the latest technologies, or a supplier ready to collaborate on the next big project, RTE’s R&D team is always looking to work with people who are willing to roll up their sleeves and test ideas in the real world. To explore partnership opportunities and discuss how we can work together, get in touch to start a conversation.

Express DHL References

  1. Association of American Railroads. (2023). Rail Express Freight Market Trends 2022-2023. Washington, D.C.
  2. U.S. Environmental Protection Agency. (2023). Proposed Greenhouse Gas Standards for Heavy-Duty Freight Vehicles. EPA 420-R-23-005.
  3. Railway Trucking Express Internal Supplier Performance Report. (2022). RTE Operations Department, Chicago, IL.
  4. MIT Transportation & Logistics Lab. (2023). Dynamic Scheduling for Intermodal Rail Freight. Journal of Transportation Engineering, Part A: Systems, 149(8), 04023057.
  5. Global Supply Chain Sustainability Alliance. (2024). Low-Carbon Rail Freight Benchmark Report. GSC Press, New York.

Foshan Shijie International Logistics Co., Ltd.
With abundant experience, we are one of the most professional railway trucking express service suppliers in China. We are committed to offering reliable railway trucking express service and logistics solutions with low price. If you have any enquiry about quote, please feel free to email us.
Address: Room 701A, Office Building, Jinbo Commercial Center, No. 88, Guiye Road, Guicheng Street, Nanhai District, Foshan City, Guangdong Province
E-mail: alicesmith.tradingbusiness@gmail.com
WebSite: https://www.fsshijielogistics.com/